OCSC

Ciechanów Ring Road, Poland

The project includes the design of 14 kilometres of city roads with 11 No. roundabout and 16 No. crossroad junctions. The project also includes the design of 2 No. new bridges, a traffic study for the city, street lighting design, relocation and design of underground services including gas, electricity, municipal heating, water mains, surface water drainage and foul water drainage and the undertaking of extensive geotechnical reports.

OCSC took the scheme from preliminary design through to the permit stage including extensive environmental liaison. The project required detailed liaison and negotiation with local utility companies in the city of Ciechanów.

Ciechanów Ring Road, Poland from O’Connor Sutton Cronin on Vimeo.

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 3.0 Unported License.